AES Lalpir Power Plant
Construction Manager — AES Lalpir 2×362 MW (1996–1998); client Nichimen Corporation.
CV-backed highlights
- Mechanical erection of static and rotary equipment; fabrication & erection of piping, steel structure, pipe rack.
- Erection of boilers and turbines; painting and insulation; ~5.0 million man-hours; manpower ~2,900.
- 2× water-tube boilers 1,200 TPH each; steam turbines 362 MW and 365 MW with coupled generators.
- Fuel Gas Desulphurization (FGD) Unit #2 including wet stack; temporary facilities for MHI personnel.