Sectors
Power Plants
Thermal CCPP, large coal/oil thermal, and hydel power construction and QA/QC.
CV-backed highlights
- Construction Manager — AES Lalpir 2×362 MW (1996–1998); boilers, turbines, FGD.
- I/C QA&QC — CCPP Upgradation Kot Addu (1994–1995); I/C QA&QC — CCPP Kot Addu (1988–1989).
- I/C QA&QC — Hydro Electric Power Project Mangla (1989–1991); tunnel steel lining Units 9 & 10.
- Mechanical erection quantities for 2×100 MW CCPP Kot Addu Units 11 & 12 (Alstom / Stein).